‹ Intel
Insight·07.15.24·2 min read

SANDAG Proposes Tunnels to Relocate Del Mar's Railroad Tracks

SANDAG has introduced three proposals to relocate the railroad tracks currently situated along the Del Mar bluffs, moving them inland and undergr

SANDAG Proposes Tunnels to Relocate Del Mar's Railroad Tracks

SANDAG has introduced three proposals to relocate the railroad tracks currently situated along the Del Mar bluffs, moving them inland and underground. The transportation agency seeks public input before finalizing its proposal.

The proposals focus on a 1.7-mile section of the San Diego-Los Angeles-San Luis Obispo rail corridor between Sorrento Valley and Solana Beach, aiming to address the erosion issues of the cliffside. All options suggest converting the current single-track route into a double-track system running through a tunnel. However, each plan offers distinct differences:

Alternative A

This plan proposes completely removing the above-ground tracks in Del Mar. Trains would enter a tunnel between Carmel Mountain Road and State Route 56, then follow a path parallel to Interstate 5. The tracks would return to the coastline beneath the San Dieguito Lagoon, reconnecting with the existing railway near the fairgrounds. Additional infrastructure would be developed within the Los Peñasquitos Lagoon area. A new underground special events platform would be created under the fairgrounds, starting south of the existing Solana Beach station.

Alternative B

The second proposal features a tunnel entrance at Carmel Valley and another near Jimmy Durante Boulevard, just south of the Del Mar Fairgrounds. To accommodate this, the boulevard would need to be raised. This alternative would place the train tracks beneath parts of the Torrey Pines State Reserve and the city of Del Mar, rather than following the interstate and lagoon as in Alternative A.

Del Mar · From Intel
$4.0MMedian sale price▲ 35.8% YTD
148New listings this year▼ 5.1% YTD
49Average days on market▲ 14.0% YTD
32Homes on the market▼ 36.0% YoY

Source: SDAR, Del Mar single-family market, September 2026.

Alternative C

Alternative C proposes that the tracks be relocated closer to Carmel Valley Road. The track berm would then be raised by 8 feet and enter a tunnel at Del Mar Car Care. The tunnel would then travel roughly underneath Camino Del Mar until it links back up with the current train tracks near Jimmy Durante.

Additional Information and How to Comment

SANDAG's updated rail system proposals are outlined in a Notice of Preparation, which includes details on Alignments A, B, and C. All plans involve significant tunneling, construction, and costs, with impacts on private properties. The double-tracked system aims to increase the frequency and speed of passenger, freight, and military trains.

Public comments on the Draft Environmental Impact Report (EIR) are due by July 19, 2024. Comments can be submitted online, via email, or by mail to SANDAG.

  • Online: SANDAG Rail Realignment
  • Email: [email protected]
  • Mail: Tim Pesce, 401 B Street, Ste 800, San Diego, CA 92101

Talk to us ›
Share
EmailLinkedIn
Filed underDel MarInsight
Jon Granston
Written by

Jon Granston

Founder of Advisory and curator of Intel. Jon writes about the coastal San Diego market, the people shaping it, and what it means for buyers and sellers.

More from Jon ›
Up next·Insight
A Comprehensive Guide to Home Insurance in California

A Comprehensive Guide to Home Insurance in California

A Comprehensive Guide to Home Insurance in California As homeowners in the Golden State, we're no strangers to the challenges

Read the story ›
A Comprehensive Guide to Home Insurance in California

Stay informed.

The weekly market update and new listing alerts, delivered to your inbox.

Get In Touch

Our team responds within 24 hours.

I agree to be contacted by Advisory San Diego via calls, emails and text. To opt out you can reply "STOP" at any point or click the unsubscribe link in the emails. Message frequency varies. Message and data rates may apply. Privacy Policy & Terms of Service.